Every WWTP has a lot to say to engineers. We speak its language.
Where is the plant, and how does it compare?
A registry of wastewater treatment plants in Saudi Arabia and the Gulf, built from open documents. One record per plant.
Live
Registry map · The registry on one map: plants by region, with how many locations are confirmed.Folo Atlas
How do we size and design it?
Process sizing of a treatment plant, stage by stage, with the source equation behind every number. Your licensed engineer signs the design.
Process Flow Diagram (PFD) · Illustration of the format — coming after mass balance.Folo Labs output #1
Available now · 3
Beta (API) · 3
Coming · 12
Demo
Who do we buy the equipment from?
Equipment for the sized plant: data sheets filled from the design, and vendors to request quotes from.
Coming soon
Blower data sheet · The duty filled from your design, the vendor columns left open; lines the designer has not given stay “not computed”.Example format — coming soon
What state is the equipment in right now?
The state of running equipment and instruments, read from sensors and kept next to the plant record.
Planned
Instrument List & Control Narrative · Instruments and control loops for the stages your plant has, without manufacturers.Example format · Folo Labs output #7
Does it meet the discharge standard?
Discharge and reuse requirements written as rules and checked before design starts, then against every result.
In development
Effluent limits and results · Your limits with their source; “not met” first, “not checked” with the reason.Example format — coming soon
Riyadh · Saudi Arabia
Reference
Method, document and page next to each result.
Status
“Not met” first, “not checked” with a reason, provisional values marked.
Signature
We speed up the designer and the bid engineer. A person signs the design.